Problem
Incident reporting and dispatch ran on disconnected radio + paper logs. Response time averaged 14 minutes. Evidence chain broke between field officers and the case file.
Incident response 14 → 9.2 min. 24 police stations live. Field-officer adoption 96%. 100% audit-grade evidence chain.
Incident reporting and dispatch ran on disconnected radio + paper logs. Response time averaged 14 minutes. Evidence chain broke between field officers and the case file.
Mendix-built incident command platform with mobile field app, GIS-integrated dispatch, evidence-grade chain of custody, and supervisor analytics.
Average response time from 14 min to 9.2 min. 24 police stations live. Field-officer adoption at 96%. 100% audit-grade evidence chain on every case.
Five phases. One accountable team. Every phase had a named decision point and a measurable outcome.
Workshops with the Middle East Police Authority executive team, baseline metrics, target outcome tree, programme governance set up.
Reference architecture, security blueprint, joint squad model agreed. Data model and integration contracts published.
Vertical slice built and run live-parallel against the existing system. Continuous integration, daily deploys, weekly business demos.
Phased cutover, audit-aligned reconciliation, scaling out of squads, capability transfer to Middle East Police Authority teams.
Managed run with named SLOs, quarterly value reviews, and a 15% optimisation budget reserved for improvement work.
Cloud landing zone, identity, network, security baseline. Data fabric with lineage-by-default. Audit-grade observability stack from day one.
Domain-aligned microservices behind a published API surface. Event-driven core with CDC into the data fabric. Live-parallel capability built in, not bolted on.
RBAC, audit logs, lineage, policy-as-code. Model risk records for every production model. Compliance posture on the executive dashboard, not in a quarterly slide.
Production-grade choices, defended by track record. The stack is one engineering decision among many — but a load-bearing one.
Independent assurance reviews at each phase gate. Findings tracked in a single risk register with named owners and remediation deadlines.
ISO 27001, SOC 2 Type II controls applied throughout. Data lineage captured by default; sensitive data tokenised at the edge.
Deployment aligned to national cybersecurity authority controls. Sovereign cloud where data residency requires it.
WCAG-AA on every citizen-facing journey. Arabic-first design with parallel English; user-research panels include accessibility users.
Officers reach for the platform first now — that adoption tells me everything.
D Director, ICT · Middle East Police Authority
8 months from kickoff to first regulated outcome — squad density and decision velocity matter more than headcount.
Joint squads with Middle East Police Authority engineers stayed in place after go-live. Ownership did not transfer in a hand-off — it grew in place.
Live-parallel for a meaningful window before cutover bought us trust. The cutover itself was a flag flip, not a war room.
Tell us your sector and your timeline. A senior partner with sector experience will respond within one business day.